Plenum Integrity Guides

The AROK Team. is proud to provide three of the best practices guides to aid in the proper design and construction of an underfloor air distribution (UFAD) system. Trade specific guides have been created for the Architect, General Contractor, and Commissioning Agent extracted from lessons learned through AROK ’s experience working on a wide range of UFAD projects. These guides will help to ensure the proper sealing and reduction of underfloor air leakage in an access floor air plenum. Furthermore, AROK believes a holistic approach to design and construction should be used and recommends regular consultation be held with key individuals on the construction team throughout the entire design process.

An Architect’s Guide
For Detailing & Specifying
Raised Access Floor Air Plenums

This guide is designed to help an architect designing a building with a UFAD system, provide specifications and construction details to ensure the plenum is constructed with proper sealing to reduce underfloor air leakage.

The Architect’s Guide Provides:

  • Recommended steps to success
  • General Construction Specifications
  • Specification language for each division
  • Construction Sealing Details

A General Contractor’s Guide
For Constructing & Sealing
Raised Access Floor Air Plenums

The general contractor guide will aid in the coordination of subcontractors and provide methods to ensure they are informed of, and perform to the sealing requirements as described in the specifications and details provided by the architect. This guide will help you ensure every contractor working in the plenum space is aware of their responsibilities before they submit their bids or begin construction and that they are equipped with the information needed to successfully complete their work while maintaining plenum integrity and reducing underfloor air leakage.

The General Contractor ’s Guide Provides:

  • Recommended steps to success
  • Recommended Construction sequence
  • Inspection Checklist


Download
Commissioning
Agent’s Guide
1 MB PDF

A Commissioning Agent’s Guide
For Inspecting & Testing
Raised Access Floor Air Plenums

This guide was created to provide commissioning agents with proper guidelines for the review, inspection, testing, and reporting of any plenum integrity sealing deficiencies that may result in underfloor air leakage. The recommendations contained within this guide are provided to help the commissioning agent perform the responsibilities required to ensure plenum integrity.

The Commissioning Agent’s Guide Provides:

  • Recommended steps to success
  • A plenum inspection Checklist
  • Definitions of types of air leakage
  • Air leakage test procedures
  • A sample test report

For Additional Information